NWSC Boosts Water Supply Along Entebbe Road

The National Water and Sewerage Corporation has completed works and commissioned the new Ssisa Water Supply system along Entebbe road.

The new project will boost water supply to Ssisa, Lutaba, Gayaza, ICT, parts of Sekiwunga, Zziru villages and the surrounding areas.

The system works include:-
• Construction of a booster station
• Laying 4.5km of
Major works of booster station construction,  4.5km of distribution mains.
•  Installation of a 162,000 litres capacity water reservoir.

Entebbe area Engineer Engineer Anthony Ojok shared the area office has completed other interventions to boost water supply along Kasenyi road & Lyamutundwe, Kawuku-Wamala, Ziiru, Ssisa, Lutaba, Sekiwunga , Akright, Kabulamuliro, Bwebajja, Nganjo, Dewe, Kajjansi-Lumuli, Makandwa, Nakigalala, Kitovu, Mazzi, Bweya, Kitende, Kawoto and the surrounding areas.

The Director Engineering services Eng Alex Gisagara shared that the corporation has embarked on extension and intensification of the network  to extend services and serve more  people in all corners of Uganda.

According to NWSC MD, Dr.Eng Silver Mugisha, the corporation has stepped up works under the Service coverage Acceleration Programme (SCAP100).
“The programme is aimed at improving lives of the people of Uganda with clean safe water in over 12,000 villages in Uganda by 2020.” he added

Other projects that have been completed include:

•Upgrade of the booster station in Nsamizi- Entebbe to deliver more water to Kawuku and Kajjansi from the Entebbe network to cater for the growing demand for services.

•Upgrade of Namulanda booster station to double the current volumes of water being lifted to Akright reservoir for distribution to consumers.

•Installation of a new pump at Kitende booster station.

About Post Author